Discover the marvel of modern engineering with our Prefabricated Steel Structure Building/Workshop/Warehouse/Construction Building From China, meticulously crafted with professional design for those who seek excellence.
Basic Info.
Model NO.WT-ND-559
FeatureAnti-Corrosion, Earthquake Resistance, Easy Install, High Intensity
InstallSupport Installation
Main FrameH Section Steel Column & Beam
Secondary FrameBracing, Tie Bar, Angle Brace, Ect.
Roof PurlinC/Z Type Galvanized Steel Purlin
Wall & Roof CladdingSandwich Panel, Steel Sheet
Thcikness of Sandwich Panel50mm, 75mm, 100mm, 150mm
Thickness of Steel Sheet0.4mm~0.7mm
DoorSliding Door/Roller Shutter Door
WindowPVC/Aluminium Window
Surface TreatmentShot Blasting, Galvanized or Painted
DrawingAuto CAD, Pkpm, Tekla
Delivery Time45-60 Days
StandardGB, ASTM, AISI
Steel TypeCarbon Structural Steel
Type of Steel for StructureHigh-Strength Steel
Carbon Structural SteelQ235
Transport PackageSteel Pallet/Container Transport
SpecificationL*W*H
TrademarkWT
OriginChina
HS Code94069000
Production Capacity30000 Tons/Year
Production Description
| No. |
Category |
Item Name |
Description |
| 1 |
Main Steel Member |
Main Steel Frame |
Q345B Welding H Beam |
| 2 |
Stairs |
Channel Steel |
| 3 |
Purlin |
Purlin |
Galvanized C-Steel |
| 4 |
Secondary Steel Member |
YC-Verge Angle |
Angle Steel |
| 5 |
XG-tie |
Round Tube |
| 6 |
Roof & Window Bracing |
Round Steel |
| 7 |
Floor Deck |
- |
| 8 |
Panel |
Sea-blue Roof Panel |
Rock Wool Colour Steel Composite Plate |
| 9 |
White-gray Wall Panel |
| 10 |
Maintenance Materials |
Roof Panel Edges Trim, Outer Ridge Tile, Outside Corner 90º, Dado Flashing, Door Trim, Windows Trim, Outside Gutter, Downspout, Floor Deck Trim |
| 11 |
Door |
- |
Composite Plate Door |
| 12 |
Windows |
- |
Aluminum Alloy Window |
| 13 |
Install Accessories |
Project Showcase
Our Manufacturing Facility
Our facility stands as a beacon of expertise, specializing in the art of designing and manufacturing a wide array of steel structure buildings, workshops, bridges, and diverse structural projects for over 12 years. Spanning a vast area of 260,000 square meters, our facility proudly exports an impressive 50,000 tons of steel structures annually. Accredited with ISO9001:2015, ISO14001:2015, SGS, and BV Certification, we blend rich experience with a cadre of professional engineers, cutting-edge technology, and unparalleled after-sales service. This stellar mix of top-tier talents and state-of-the-art equipment positions our facility as an industry-leading enterprise, winning accolades both domestically and internationally.
Certifications
Our Comprehensive Services
Typically, our delivery is swift and efficient, occurring within 45-60 days after confirmation of the order, which is contingent upon the fabrication quantity.
- Upon completion of production, we provide detailed steel building installation drawings, ensuring clarity and precision.
- Should you require, we offer the additional service of dispatching technicians to the site to guide and oversee the installation process.
Our dedicated team of six international trade businessmen is available online 24/7, ready to assist you at any time.
To ensure longevity and the preservation of the structure's aesthetic appeal, it is imperative to apply the finish paint immediately after frame installation, with a subsequent application after 6-8 months. This proactive approach ensures the surface remains pristine for an extended period.
Global Projects
Frequently Asked Questions
What materials are used for the main framework of these steel buildings?
The main frame is constructed using H-section steel columns and beams (specifically Q345B welding H-beams), offering high-strength support and stability. Secondary frame elements include C/Z type galvanized purlins, bracing, and angle braces.
What is the expected delivery timeframe?
The typical delivery time is 45 to 60 days following order verification, which is contingent upon the exact fabrication quantity and complexity of the project.
Do you offer on-site installation support?
Yes. Upon completing production, we supply detailed steel building installation diagrams. Additionally, we can dispatch professional technicians directly to your project site to guide and supervise the entire installation process.
How should the steel structures be maintained after installation?
To secure long-term durability and aesthetic value, we recommend applying the finish paint immediately after the main frame installation. A follow-up coat should be applied within 6-8 months to keep the surface pristine.
What specifications are available for wall and roof panels?
We offer high-grade sandwich panels (available in 50mm, 75mm, 100mm, and 150mm thicknesses) and single steel sheets (ranging from 0.4mm to 0.7mm thickness) for custom wall and roof cladding.
What quality certifications do your manufacturing systems hold?
Our manufacturing facilities are fully accredited with ISO9001:2015 Quality Management System, ISO14001:2015 Environmental Management System, as well as SGS and BV Global Certifications.