Steel structure warehouses features of high fire resistance, strong corrosion resistance. Steel structure storehouse is mainly refers to the main bearing component is composed of steel. Including the steel columns, steel beam, steel structure, steel roof truss. Each component using welds, bolts or rivets to connect.
Primary Framing: Offers metal building frames main categories including Clear Span, Multi Span, Classic, High Span, Single Slope, and Lean-To. Our primary framing acts as a single unit after assembly that will support the load of the finished structure while transferring the weight to the foundation.
✔ Solid Built-up I-beam main frame construction
✔ High strength plate steel
✔ Submerged Arc/welded Frames

CS CLEAR SPAN

MS MULTI SPAN

CL CLASSIC

HS HIGH SPAN

SST SINGLE SLOPE

SSS SINGLE SLOPE

LT LEAN-TO

CUSTOM DESIGNS
Selection of secondary structural shapes, sizes, and gauges includes purlins and girts (cee and zee profiles), eave struts, base angles, clips, and other parts supporting wall and roof panels.

Zee Purlin (Roof)

Eave Strut (Roof)

Cee Purlin (Wall)

Z Girt (Wall)
Wall Girt Conditions

Flush Girt

Inset Girt

Bypass Girt
Bracing Methods

Cable X Bracing

Wind Column

Portal Frame
Introduction to I-beam
I-Beams, also known as H-Beams, have an I or H cross-section. The horizontal elements of the “I” are flanges while the vertical element is the “web”. Commonly made of structural steel or aluminum, they are widely used in construction as both beams and columns.
Technical Specifications
| Main Steel Frame |
Column |
Q235, Q355 Welded H Section Steel |
| Beam |
Q235, Q355 Welded H Section Steel |
| Secondary Frame |
Purlin |
Q235 C and Z purlin |
| Knee brace |
Q235 Angle Steel |
| Tie Rod |
Q235 Circular Steel Pipe |
| Brace |
Q235 Round Bar |
| Supports |
Q235 Angle Steel, Round Bar or Steel Pipe |
| Maintenance |
Panels |
EPS/Rock Wool/PU Sandwich Panel / Steel Sheet |
| Accessories |
Window |
Aluminum Alloy / PVC / Sandwich Panel Window |
| Door |
Sliding Sandwich Panel / Rolling Metal Door |
| Rainspout |
PVC |
| Wind Resistance |
12 Grades |
| Earthquake Resistance |
8 Grades |
| Usage Life |
Up to 50 years |
Production Process
Packing & Transportation
1. Designated personnel responsible for lifting fixtures to prevent vibration or damage.
2. Special supervision during loading to check car numbers and secure piles.
3. Trained pilots and escort personnel for oversized object transport.
4. Careful handling by personnel familiar with component weight and size.
5. Timely organization of unloading and stacking at the construction site.
Frequently Asked Questions
Q1: How long does it take to get my building?
A: Lead time varies, but typically takes 2 weeks for drawings and 6-8 weeks for delivery depending on the complexity of the project.
Q2: What are the main benefits of steel construction?
A: Steel buildings are durable with a long lifespan, have a shorter construction period than concrete, are cost-effective, reusable, and offer high strength with excellent seismic performance.
Q3: How can I obtain a quotation for my project?
A: If you have a drawing, we can offer a quotation accordingly. If you have no design, our engineers will create one for your confirmation before providing a quote.
Q4: Do you offer professional design services?
A: Yes, we provide full solution drawings using software like AutoCAD, PKPM, Tekla Structures, and more for complex industrial buildings.
Q5: Do you provide samples and installation help?
A: We offer free samples (transportation excluded) and provide detailed instruction videos/photos. If necessary, we can send engineers for construction guidance.
Q6: What are the available payment terms?
A: We accept L/C, T/T, and Western Union as payment methods for our projects.