Bildon Steel Bildon Steel

Pdf/Cad Drawing Two Doors Steel Truss Pipe Structure Warehouse Plans Workshop Design Prefabricated Shop

Product Description

Products Description
Steel Truss Pipe Structure Design Plan
Two Doors Steel Truss Pipe Structure Warehouse
Pdf/Cad Drawing Two Doors Steel Truss Pipe Structure Warehouse Plans Workshop Design Prefabricated Shop
1) Main Steel: Q355B, Q235B etc.
2) Column & Beam: Welded or Hot rolled H-section
3) Connection method of steel structure: welding connection or bolt connection
4) Wall & Roof: EPS, Rockwool, PU sandwich, corrugated steel sheet
5) Door: Rolled up door or Sliding door
6) Window: Plastic steel or Aluminum alloy window
7) Surface: Hot dip galvanized or painted
8) Crane: 5MT, 10MT, 15MT and more
Company Profile
Manufacturing Area and Production Capacity
Steel Structure Fabrication Line
ADVANTAGES
  • Exported products to over 130 countries.
  • 90 professional engineers & 1000 skilled workers.
  • Around 100 experienced construction site engineers.
  • Over 250,000 sqm manufacture area which can produce.
  • Over 200,000 tons steel structure materials annually.
We looking forward to created the bright future together with you!
Product Show
Prefabricated Steel Workshop Structure
Steel Truss Pipe Construction
Associated Marketing
Steel Structure Related Products
Our Service
Custom Design Services and Drawings
Onsite Technical Support and Inspection
Certifications
International Quality and Structural Certifications
Customer Photos
Global Customer Visits
Customer Cooperation and Site Visits
Frequently Asked Questions
Q How to buy your ideal products?
A: TT and L/C are acceptable and TT will be more appreciated. 30% deposit before producing, 70% balance before loading by TT.
Q What is the delivery time?
A: It depends on order quantities. Generally speaking, the delivery time will be within 15 to 40 days.
Q How to pack the products?
A: We use standard package. If you have special package requirements, we will pack as required, but the fees will be paid by customers.
Q How to install after the goods arriving destination?
A: We will provide detailed illustrations to you. If it is necessary, we will send technicians to help you. However, the visa fee, air tickets, accommodation, wages will be paid by buyers.
Q What raw materials are commonly used for the wall and roof?
A: We primarily utilize EPS, Rockwool, PU sandwich panels, or corrugated steel sheets to meet varying thermal insulation, fire protection, and structural requirements.
Q Can designs and layouts be customized from CAD drawings?
A: Yes, we provide full layout designs and warehouse plans customized according to your PDF or CAD drawings, ensuring exact structural specifications for workshops, shops, or warehouses.

Related Products